{"id":52960,"date":"2026-05-13T14:56:56","date_gmt":"2026-05-13T13:56:56","guid":{"rendered":"https:\/\/maritimehub.co.uk\/?p=52960"},"modified":"2026-05-13T18:53:29","modified_gmt":"2026-05-13T17:53:29","slug":"matsons-fleet-expansion-moves-into-full-production-at-hanwha-philly-shipyard","status":"publish","type":"post","link":"https:\/\/maritimehub.co.uk\/matsons-fleet-expansion-moves-into-full-production-at-hanwha-philly-shipyard\/","title":{"rendered":"Matson\u2019s Fleet Expansion Moves Into Full Production at Hanwha Philly Shipyard"},"content":{"rendered":"<p>Matson\u2019s first Aloha class ship \u2018Daniel K. Inouye\u2019 making its first approach to Honolulu on its maiden voyage, November 28, 2018. Photo: Matson<\/p>\n<p>Matson\u2019s Fleet Expansion Moves Into Full Production at Hanwha Philly Shipyard<\/p>\n<p>Matson\u2019s $1 billion Aloha Class fleet renewal program reached another major milestone Tuesday as<\/p>\n<p>Hanwha Philly Shipyard<\/p>\n<p>advanced construction on the second and third LNG-powered containerships destined for the Jones Act trades.<\/p>\n<p>The latest milestones build on the program\u2019s<\/p>\n<p>October 2024 steel-cutting ceremony<\/p>\n<p>for the first vessel, which marked the return of commercial containership construction at the Philadelphia yard after several years focused largely on government work and repair contracts.<\/p>\n<p>Tuesday\u2019s events included the dock mounting of the first grand block assembly for the program\u2019s second vessel \u2014 signaling the start of hull assembly \u2014 along with the official steel cutting for the third and final ship in the series.<\/p>\n<p>The three vessels are designed for Matson\u2019s Hawaii and China-Long Beach Express (CLX) services and are scheduled for delivery in 2027 and 2028. The ships will replace three existing vessels in Matson\u2019s fleet while continuing the carrier\u2019s push toward lower-emissions operations.<\/p>\n<p>Like Matson\u2019s existing Aloha Class ships<\/p>\n<p>, delivered in 2018 and 2019, the newbuilds will measure 854 feet long with capacity for 3,600 TEU and service speeds exceeding 23 knots, a key requirement for Matson\u2019s premium expedited Pacific services.<\/p>\n<p>The vessels are being built with LNG dual-fuel capability and additional energy-efficiency technologies aimed at supporting Matson\u2019s greenhouse gas reduction goals.<\/p>\n<p>The project also underscores the growing strategic importance of Hanwha Philly Shipyard within the U.S. commercial shipbuilding sector following the yard\u2019s acquisition by South Korea\u2019s Hanwha Group. The ownership transition, completed after the original order announcement in 2024, marked the first major Korean investment in a U.S. commercial shipyard and injected new momentum into Jones Act shipbuilding at a time of renewed political focus on rebuilding domestic maritime capacity.<\/p>\n<p>Hanwha Philly Shipyard says it has delivered roughly half of all large ocean-going Jones Act commercial ships built in the United States since 2000.<\/p>\n<p>In addition to the Matson program, the yard is also constructing National Security Multi-Mission Vessels for the U.S. Maritime Administration and the offshore subsea rock installation vessel<\/p>\n<p>for Great Lakes Dredge &#038; Dock.<\/p>\n<div class=\"mh-source-attribution\">\n  <span>Source:<\/span><br \/>\n  <a href=\"https:\/\/gcaptain.com\/matsons-fleet-expansion-moves-into-full-production-at-hanwha-philly-shipyard\/\" target=\"_blank\" rel=\"nofollow noopener\">gcaptain<\/a>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Matson\u2019s first Aloha class ship \u2018Daniel K. Inouye\u2019 making its first approach to Honolulu on its maiden voyage, November 28, 2018. Photo: Matson<br \/>\nMatson\u2019s Fleet Expansion Moves Into Full Production at Hanwha Philly Shipyard<br \/>\nMike Schuler<br \/>\nTotal Views: 0<br \/>\nMay 5, 2026<br \/>\nMatson\u2019s $1 billion Aloha Class fleet renewal program reached another major milestone Tuesday as<br \/>\nHanwha Philly Shipyard<br \/>\nadvanced construction on the second and third LNG-powered containerships destined for the Jones Act trades.<br \/>\nThe latest milestones build on the program\u2019s<br \/>\nOctober 2024 steel-cutting ceremony<br \/>\nfor the first vessel, which marked the return of commercial containership construction at the Philadelphia yard after several years focused largely on government work and repair contracts.<br \/>\nTuesday\u2019s events included the dock mounting of the first grand block assembly for the program\u2019s second vessel \u2014 signaling the start of hull assembly \u2014 along with the official steel cutting for the third and final ship in the series.<br \/>\nThe thr<\/p>\n","protected":false},"author":1,"featured_media":52961,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"fifu_image_url":"","fifu_image_alt":"","c2c-post-author-ip":"2.217.156.155","footnotes":""},"categories":[1,9007],"tags":[],"class_list":["post-52960","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest","category-maritime-security"],"acf":[],"_links":{"self":[{"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/posts\/52960","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimehub.co.uk\/?rest_route=%2Fwp%2Fv2%2Fcomments&post=52960"}],"version-history":[{"count":1,"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/posts\/52960\/revisions"}],"predecessor-version":[{"id":52962,"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/posts\/52960\/revisions\/52962"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/media\/52961"}],"wp:attachment":[{"href":"https:\/\/maritimehub.co.uk\/?rest_route=%2Fwp%2Fv2%2Fmedia&parent=52960"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimehub.co.uk\/?rest_route=%2Fwp%2Fv2%2Fcategories&post=52960"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimehub.co.uk\/?rest_route=%2Fwp%2Fv2%2Ftags&post=52960"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}