{"id":53576,"date":"2026-05-15T20:43:28","date_gmt":"2026-05-15T19:43:28","guid":{"rendered":"https:\/\/maritimehub.co.uk\/?p=53576"},"modified":"2026-05-15T20:43:28","modified_gmt":"2026-05-15T19:43:28","slug":"nassco-secures-856-million-for-another-navy-fleet-oiler","status":"publish","type":"post","link":"https:\/\/maritimehub.co.uk\/nassco-secures-856-million-for-another-navy-fleet-oiler\/","title":{"rendered":"NASSCO Secures $856 Million for Another Navy Fleet Oiler"},"content":{"rendered":"<p>The John Lewis-class replenishment oiler USNS Harvey Milk (T-AO-206) conducts a replenishment at sea with the world\u2019s largest aircraft carrier, USS Gerald R. Ford (CVN 78), right, and the Arleigh Burke-class guided-missile destroyer, USS Ross (DDG 71), December 13, 2024. U.S. Navy<\/p>\n<p>NASSCO Secures $856 Million for Another Navy Fleet Oiler<\/p>\n<p>General Dynamics NASSCO has received $856 million in funding to build T-AO 217, the latest ship in the U.S. Navy\u2019s John Lewis-class fleet replenishment oiler program.<\/p>\n<p>The funding is part of an eight-ship block-buy contract<\/p>\n<p>awarded in September 2024<\/p>\n<p>covering T-AO 214 through T-AO 221. NASSCO is now under contract to build 17 of the Navy\u2019s planned 20 oilers and has delivered five to date.<\/p>\n<p>The San Diego shipbuilder said T-AO 217 will be the 13th ship in the program and is aimed at sustaining production continuity at the yard.<\/p>\n<p>\u201cThe T-AO program is a cornerstone fixture for the dedicated team at NASSCO, representing the longest-standing Navy production series in our history,\u201d said Dave Carver, president of General Dynamics NASSCO. He said the funding \u201cmaintains a steady workforce and helps mitigate the risk of future layoffs\u201d as the company seeks timely funding for ships 14 through 17.<\/p>\n<p>The John Lewis-class oilers are designed to refuel U.S. Navy ships at sea, extending the reach of carrier strike groups and other deployed forces. The 742-foot ships have a full-load displacement of 49,850 tons, capacity for 162,000 barrels of oil, dry cargo capability, aviation support and speeds of up to 20 knots.<\/p>\n<p>The Navy first awarded NASSCO the contract to design and build the first six John Lewis-class oilers in 2016. The contract was expanded in 2022 to add three more ships, followed by the 2024 block buy for up to eight additional vessels.<\/p>\n<p>Five John Lewis-class oilers have been delivered, with five more under construction at NASSCO\u2019s San Diego yard.<\/p>\n<div class=\"mh-source-attribution\">\n  <span>Source:<\/span><br \/>\n  <a href=\"https:\/\/gcaptain.com\/nassco-secures-856-million-for-another-navy-fleet-oiler\/\" target=\"_blank\" rel=\"nofollow noopener\">gcaptain<\/a>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The John Lewis-class replenishment oiler USNS Harvey Milk (T-AO-206) conducts a replenishment at sea with the world\u2019s largest aircraft carrier, USS Gerald R. Ford (CVN 78), right, and the Arleigh Burke-class guided-missile destroyer, USS Ross (DDG 71), December 13, 2024. Navy<br \/>\nNASSCO Secures $856 Million for Another Navy Fleet Oiler<br \/>\nMike Schuler<br \/>\nTotal Views: 0<br \/>\nMay 15, 2026<br \/>\nGeneral Dynamics NASSCO has received $856 million in funding to build T-AO 217, the latest ship in the U.S.<\/p>\n","protected":false},"author":1,"featured_media":53577,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"fifu_image_url":"","fifu_image_alt":"","c2c-post-author-ip":"2.217.156.155","footnotes":""},"categories":[1,9007],"tags":[],"class_list":["post-53576","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest","category-maritime-security"],"acf":[],"_links":{"self":[{"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/posts\/53576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimehub.co.uk\/?rest_route=%2Fwp%2Fv2%2Fcomments&post=53576"}],"version-history":[{"count":1,"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/posts\/53576\/revisions"}],"predecessor-version":[{"id":53578,"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/posts\/53576\/revisions\/53578"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimehub.co.uk\/?rest_route=\/wp\/v2\/media\/53577"}],"wp:attachment":[{"href":"https:\/\/maritimehub.co.uk\/?rest_route=%2Fwp%2Fv2%2Fmedia&parent=53576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimehub.co.uk\/?rest_route=%2Fwp%2Fv2%2Fcategories&post=53576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimehub.co.uk\/?rest_route=%2Fwp%2Fv2%2Ftags&post=53576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}