
The conversion entailed set up of a moonpool, a laboratory, a storage room for geological samples, a refrigerated container, an incinerator, workshops, a hydraulic unit, a compressor room, and a prefabricated mezzanine deck that encompasses a 40-metre (130-foot) drilling rig.
Though the vessel’s unique structure meant {that a} moonpool could also be put in sooner or later, the hull was strengthened even additional to make sure that the moonpool can be higher suited to the vessel’s new function.
Source link