News

North Star Group’s New CSOV Grampian Kestrel Launched in Romania

Grampian Kestrel is the primary in a sequence of two CSOVs that Vard is constructing for North Star. The vessel is scheduled to be delivered in June 2026 whereas sister vessel Grampian Eagle will handed over the next August.

The CSOV utilises a design that was developed by Vard Design particularly for North Star. The vessel options an optimised hull kind and shall be fitted with a hybrid propulsion system that may be configured to run on methanol gas sooner or later.


Source link

Ryan

Ryan O'Neill is a maritime enthusiast and writer who has a passion for studying and writing about ships and the maritime industry in general. With a deep passion for the sea and all things nautical, Ryan has a plan to unite maritime professionals to share their knowledge and truly connect Sea 2 Shore.

Related Articles

Back to top button
error: Content is protected !!