News

US orders Orsted to halt offshore wind project deepening industry woes

The $1.5 billion venture that Orsted was developing, Revolution Wind, was scheduled to be accomplished subsequent 12 months and anticipated to supply sufficient electrical energy to energy 350,000 houses in Rhode Island and Connecticut.

All offshore foundations had been put in and 45 out of 65 wind generators had been already in place, Orsted mentioned.

The Nationwide Ocean Power Industries Affiliation, an trade commerce group, mentioned halting work on a venture that’s nearly completed would jeopardize jobs and funding.


Source link

Ryan

Ryan O'Neill is a maritime enthusiast and writer who has a passion for studying and writing about ships and the maritime industry in general. With a deep passion for the sea and all things nautical, Ryan has a plan to unite maritime professionals to share their knowledge and truly connect Sea 2 Shore.

Related Articles

Back to top button
error: Content is protected !!