ETO & ELECTRICAL
ETO & Electrical Systems Hub
High-voltage, low-voltage, automation and power management in one structured space. Use the left-hand ETO Menu to move between topics without leaving the section.
On Watch
Fast entry points for the electrical issues that get you called to the switchboard room at 03:00.
Generator won’t parallel / unstable voltage
AVR behaviour, excitation checks, synchronising — before and after paralleling.
Unexpected load-shedding or blackout
PMS logic, priority tables, blackout recovery, non-essential trip sequence.
Motor tripping on start or VFD faults
Starting current, DOL vs soft-start vs VFD, common fault codes, cable faults.
UPS alarms / degraded autonomy
Battery health, bypass behaviour, autonomy testing, critical-load mapping.
Nuisance trips from harmonics or THD
VFD-driven harmonics, resonance, filter health, measurement discipline.
HV permit about to expire
Safe isolation, proving dead, earthing, the specific hazards of 3.3–11 kV work.
Fault Finder & High-Risk Work
Structured fault paths and the electrical jobs that demand the most discipline.
Protection & Coordination
Relay settings, discrimination, fault level estimates, trip test records.
Blackout Recovery
Black-start sequence, essential restoration, DG priority, lessons from real events.
Arc-Flash & HV Permits
What a safe HV work pack looks like — PPE category, boundaries, proving dead.
Shore Power Integration
Cold-ironing on older ships, synchronisation, earthing, interface protection.
VFD Troubleshooting
Common fault codes, dv/dt issues, motor-cable length limits, bearing currents.
Hazardous-Area Equipment
Ex ratings, certified repairs, inspection grades, what a failed certification looks like.
Core References & Visuals
Key electrical reference points — switchboards, protection and motor systems.
Main switchboard — where paralleling discipline is tested.
MCC panels — every starter, every thermal setting, every log.
Drives & motors — start behaviour tells you more than a data sheet.
Checklists, SOPs & Test Records
The paperwork that actually earns its place in the ETO’s day — and holds up in audit.